FGD desulfurization wastewater is purged from limestone-gypsum scrubber loops when chloride builds to 10,000-30,000 mg/L, and zero liquid discharge for it now follows a well-defined route: conventional chemical softening to strip heavy metals, membrane or electrodialysis concentration to shrink the volume, then evaporation-crystallization to split the remainder into reusable distillate and solid salt. Published pilot and plant data (external industry references — indicative, not a project guarantee) show 93% freshwater recovery from the membrane stage alone and selective chloride removal cutting blowdown volume by up to 90%.
Where FGD Wastewater Comes From and Why It Exists at All

Wet flue gas desulfurization systems remove sulfur dioxide from coal-fired boiler flue gas by contacting it with a limestone slurry in an absorber. The absorber liquor circulates and is largely reused internally, but flue gas carries hydrogen chloride that dissolves into the loop as chloride. Chloride is the root cause of FGD blowdown: as it accumulates it depresses sulfur dioxide absorption efficiency and raises corrosion risk in the scrubber vessel and internals. When chloride concentration exceeds the plant’s set control level, a purge stream is drawn off, and that purge is FGD wastewater.
The purge leaves the absorber saturated with calcium sulfate and carrying metals and chlorides. Downstream, gypsum dewatering and washing return additional water to the wastewater stream. The result is a brine whose defining chemistry is high chloride, high calcium, and trace heavy metals, a combination that general-purpose wastewater plants are not built to handle, which is why power stations are required to maintain a dedicated, standalone desulfurization wastewater treatment system.
Water Quality Numbers That Drive the Design

The figures below form an illustrative feed envelope for FGD blowdown, constructed from published operating data of thermal plants — not customer or project data. The actual purge must be confirmed by analysis:
| Parameter | Illustrative range (envelope) | Significance |
|---|---|---|
| Chloride | 10,000-30,000 mg/L | Root purge driver; corrosion and metallurgy constraint |
| Dissolved salts (total) | ~40,000 mg/L | Dominated by Cl-, followed by Ca2+ and SO42- |
| Suspended solids | ~1.5% after hydrocyclone; up to 32,000 mg/L | Gypsum fines; must be removed before membranes or evaporators |
| COD (CODCr) | 150-300 mg/L | From reducing inorganic ions, not organics; weak-acid stream |
| Heavy metals | Trace, regulated | Pb, Hg, As, Ni among controlled substances |
One subtlety matters for process selection: the COD in FGD wastewater derives from reducing inorganic ions such as sulfite, not from organic carbon. Biological treatment therefore has no meaningful role, and the treatment train is built entirely on precipitation, membrane, and thermal unit operations.
The Conventional Triple-Box Treatment Train

The baseline FGD wastewater process at most plants is a physicochemical sequence in three reaction boxes followed by clarification:
- Neutralization box: lime slurry raises pH to about 9. Most heavy metals precipitate as hydroxides; calcium reacts with fluoride to form low-solubility CaF2, and arsenic coprecipitates as calcium arsenite species.
- Settling box: an organic sulfide reagent (TMT-15) is dosed to react with the remaining Pb2+ and Hg2+, forming metal sulfides still less soluble than the hydroxides.
- Flocculation box: poly-ferric chloride sulfate (FeClSO4) coagulates suspended solids and colloids into micro-flocs, and a cationic polymeric coagulant aid at the box exit lowers particle surface tension so flocs grow before entering the clarifier.
- Clarification and thickening: flocs settle and thicken to sludge, which is dewatered and conveyed to the residue yard; the overflow is collected, final pH is corrected to 6.0-9.0 with hydrochloric acid, and the effluent is pumped out, historically to ash sluicing.
This train is proven and inexpensive to run, but it removes metals and suspended solids while doing nothing about the dissolved chloride and sodium load. That was acceptable when the clarified effluent could be blended into ash handling water; it stops being acceptable when the plant is required to reach zero liquid discharge.
Why ZLD Became the Compliance Endpoint

Regulatory tightening on FGD discharges specifically targets the dissolved-salt fraction that conventional treatment passes through. Once the clarified effluent has nowhere lawful to go, the plant must either eliminate it or evaporate it. Two thermal architectures are used, and they differ in what they do with the salt.
Full Evaporation and Crystallization
The evaporation system is built from four units: a heat input unit that takes plant steam through pressure reduction into a low-pressure steam reservoir; a heat recovery unit; the crystallization unit; and associated systems. Treated wastewater is concentrated through multiple evaporation chambers into a salt slurry, classified by hydrocyclone, dewatered in a centrifuge, and dried on a heated bed for disposal off-site as solid salt. Centrate and cyclone overflow return to the heating system for re-concentration. The process is terminal, it does not affect the rest of the plant since it sits at the end of the water system, but it consumes steam and auxiliary power, and both capital and operating cost are high.
Salt Concentration with Calcium Chloride Byproduct
The alternative recovers the salt as a saleable liquid. A falling-film mechanical vapor compression evaporator concentrates the conventionally treated wastewater into clean distillate, which returns to the FGD system as process make-up water, and a calcium chloride solution byproduct. The 33% CaCl2 product is trucked to market for dust suppression, soil stabilization, de-icing, and highway-related applications. In this architecture the liquor is distributed as a film on titanium tube walls; as water evaporates from the falling film, calcium sulfate crystallizes, and the suspended gypsum crystals themselves provide nucleation sites that protect the tubes from scaling, provided suspended and dissolved solids concentrations in the evaporation channel are actively controlled. Hydrochloric acid and scale inhibitor are dosed upstream, and the slurry is degassed and preheated near boiling before feeding.
Membrane and Electrodialysis Pre-Concentration: Shrinking the Thermal Duty
Because evaporation is the costliest step per cubic meter, the modern flowsheet inserts concentration ahead of it. Published results from the electrodialysis and high-pressure RO side of the industry quantify what pre-concentration buys:
- Selective monovalent electrodialysis (mEDR) removes chloride selectively, enabling the FGD loop to recycle water internally and cutting the blowdown volume itself by up to 90%, which shrinks every downstream unit. An EPRI-summarized pilot at a large US coal plant (external industry reference) recovered 93% of freshwater from FGD wastewater using this approach.
- Automated chemical softening ahead of membranes removes metals and fluorides while avoiding coagulants that would damage RO membranes, delivering a 0.1-micron-filtered, RO-friendly fluid.
- High-pressure RO concentrates the softened brine up to about 130,000 mg/L (published membrane performance data), directly minimizing the evaporative crystallizer’s required capacity.
| Process Module | Candidate Equipment Types | Selection Basis | Module Function |
|---|---|---|---|
| Softening / metals removal | Triple-box lime + sulfide + coagulant train, clarifier | Metals, fluoride and solids load | Strips heavy metals and suspended gypsum ahead of membranes |
| Chloride-selective concentration | Monovalent electrodialysis (mEDR) | Blowdown volume, water-recycle value | Cuts purge volume and internal water recycle |
| Brine concentration | High-pressure RO on softened feed | Membrane-friendliness of feed | Shrinks thermal duty per cubic meter |
| Thermal endpoint | MVR / steam evaporation-crystallizer, or CaCl2 concentrator (potential material considerations: titanium-class tubes) | Salt endpoint choice, steam vs electricity | Splits remaining brine into distillate and solid or liquid salt |
Configuration, materials and operating envelopes above are potential considerations and indicative envelopes; actual selections depend on feed composition, temperature, pressure, corrosion review, fouling behavior, utilities and project capacity.
The economics point is architectural: sites with fly ash disposal capacity and landfill availability can stop at selective chloride removal and internal recycle; sites facing full-stream treatment mandates hybridize softening, RO, and evaporation. Every cubic meter removed before the evaporator reduces both the steam or electricity bill and the crystallizer capital.
Reference Installation: Gas-Fired Plant High-Salinity Concentrate
A vendor-published Chinese gas-turbine power plant case in Shenzhen — an external industry reference, not an EvapCryst delivery; outcomes indicative, not a project guarantee — provides a compact reference for the thermal end of the train. The site operated an integrated MVR evaporation-crystallization unit on a high-salinity membrane concentrate, itself the reject of an upstream concentration stage: the evaporator concentrated the liquor, and a centrifuge separated the crystalline salt, with stable operation, low running cost, and compliant, stable product water. The packaged MVR design occupied about one-third the footprint of comparable field-erected equipment, arrived ready for commissioning without civil works, and combined online cleaning with periodic off-line cleaning, after which the units restored 100% of design performance per the same vendor publication.
Choosing Between the Two Salt Endpoints
| Criterion | Solid salt disposal | 33% CaCl2 solution sale |
|---|---|---|
| Salt output | Dried mixed-salt cake from centrifuge and drying bed | Liquid byproduct trucked to market |
| Revenue | None; disposal cost accrues | Byproduct credit for dust control, soil stabilization, de-icing |
| Market dependency | None, but landfill capacity required | Regional demand for calcium chloride solutions |
| Thermal duty | Full evaporation to dryness including drying stage | Concentration to 33%, less water boiled off per tonne of salt |
| Water recovery | Distillate returned as FGD make-up | Distillate returned as FGD make-up |
When This Route May Not Fit
The full ZLD train is a compliance instrument, not a universal default. It may not fit when: the plant’s permit still allows clarified effluent to ash sluicing or a compliant outfall, so the triple-box endpoint remains lawful and far cheaper; fly ash disposal capacity and landfill availability let the site stop at selective chloride removal and internal water recycle; the region has no market for 33% calcium chloride solution, killing the byproduct-sale variant and leaving only disposal-grade salt; the unit is scheduled to retire or convert fuel within the amortization window, so ZLD capital cannot pay back; or steam and electricity are both constrained at the site, starving the thermal endpoint. In those cases partial-concentration scope, not full ZLD, is the honest engineering answer.
What Must Be Verified
Before this route is fixed for your plant, verify: a full purge characterization — chloride, calcium, sulfate, magnesium, fluoride, trace metals and suspended gypsum, across load swings and limestone sources — because these set both the softening chemistry and the metallurgy; softening reagent screening (lime dose, sulfide, coagulant) on the actual stream; membrane fouling propensity after softening, since gypsum fines are the usual RO killer; a corrosion and scaling review for the evaporator at your chloride and calcium levels; hazardous-waste classification of the final salt in your jurisdiction, which decides the disposal endpoint; and confirmed utility capacity — steam or electricity — for the thermal stage. Performance figures on this page come from published pilot, plant and vendor data: external references, indicative, not a project guarantee.
FAQ
Why do power plants have to purge FGD wastewater at all?
Flue gas hydrogen chloride dissolves into the scrubber liquor as chloride. Above the control setpoint, chloride depresses SO2 absorption and accelerates corrosion, so a purge is drawn, carrying 10,000-30,000 mg/L chloride together with saturated calcium sulfate and metals.
What does the conventional triple-box treatment remove?
Lime raises pH to about 9 precipitating most metals as hydroxides plus CaF2 and calcium arsenite; TMT-15 sulfide captures residual lead and mercury; poly-ferric chloride sulfate coagulates the solids for clarification; and the overflow is pH-corrected to 6-9. It does not remove dissolved chloride or sodium.
Can FGD wastewater reach zero liquid discharge without evaporation?
No. Membranes and electrodialysis shrink the volume, with published external-reference data showing selective chloride removal cutting blowdown up to 90% and pilot freshwater recovery of 93%, but the terminal dissolved-salt removal step in every full ZLD flowsheet is thermal evaporation with crystallization.
What can be done with the recovered salt?
Either dispose of it as a dried mixed-salt cake from the centrifuge, or operate the salt-concentration variant that sells a 33% calcium chloride solution into dust suppression, soil stabilization, and de-icing markets while returning distillate as FGD make-up water.
Is the COD in FGD wastewater an organic problem?
No. The 150-300 mg/L CODCr comes from reducing inorganic ions such as sulfite, so biological treatment is irrelevant to this stream; the treatment train is built on precipitation, membrane, and thermal operations.